Job Details Posted: 24 September, 2026

SS POWER I LTD

Electrical Work Foreman

Published: 24 September, 2026
Deadline: 5 October, 2026 Today
Chattogram (Banshkhali)

Company Profile

SS Power I Limited- 1320 MW Coal Power Projects. A joint venture company (JVC) comprising of country?s S Alam Group and Chinese SEPCO-3 Electric Power Constitution Corporation and HTG Group.

Vacancies 1
Employment Type Full Time
Job Category Engineer/ Architect
Gender Not specified
Job Location Chattogram (Banshkhali)
Salary --
Educational Requirement

HSC / Vocational

Experience

• 8 to 12 years
• The applicants should have experience in the following business area(s): Power

Other Requirement

The candidate should have 8–12 years of experience as an Electrical Foreman in Steam Turbine/CCPP Power Plant, with strong expertise in electrical maintenance and erection activities.

Responsibilities

SS Power I Limited, a China-Bangladesh joint venture company, is one of the largest private-sector investments in Bangladesh`s power sector. The Company operates a 1,320 MW (2 x 660 MW) coal-fired supercritical thermal power plant at Banskhali, Chattogram, Bangladesh. SS Power I Limited invites applications from suitably qualified and experienced professionals of mentioned disciplines:

Other Facilities

SS Power I Ltd. offers attractive salary for the deserving candidates with attractive market-based benefits.

Apply Method Corporate Inbox & Email

Apply Instruction

All applications to be sent through e-mail: resume@sspowerbd.com.In the subject line of the email please write only the name of the vacant position for which you have applied.

Send your CV to: resume@sspowerbd.com

Apply online through our corporate inbox.